MediaArhiv

Part 5

page 62/120

Direct the Headquarters to the Engineer, or send the Headquarters to the Engineers of that place to take a plan and with the situation with the correct water level profile where the cities should be laid out and around so much should be cofortified from that place to that officer, according to that drawing and with the profiles. To carry out a project in such a time, such a big thing can be built, and that it is necessary for him to work with people and supplies, tools and all sorts of materials and other needs with every explanation, he must assign drawings with the corresponding profiles with the situation and projects and report against the decree given to him where he will be ordered, and how these drawings and projects entrusted to the General Director, it is necessary for him, in cooperation with the generals and the Headquarters of the Engineering Officers who have received him, to thoroughly carry out the organization, and if, in any case, correcting any malfunctions for the better, carry out the project according to his own opinion, and this place will also be inspected for the laying of a small building for strengthening The General Director himself should be in charge, and in his absence he should be from the Fortification General to the General Director, and report to the General Director about this, and offer him where it is necessary and demand a sum of money and other things that are required to the structure of the Fund.

“For the better correction of the entire State, it is necessary for the General Director to travel every year himself, and when for some need it is impossible for him, then the Major General or Colonel Engineer should go to those cities.” |