MediaArhiv

Part 7

page 77/120

In addition, the General Engineer at the main command of the Engineering Corps for the best representation of both the corps and the enterprises related to the art of participating in the State Military Collegium, and the administration of the office and the corps on business trips and in works in the ranks as well as fortification in buildings has to act according to the Disposition of the General Engineer, and when it is not given, then according to his position he has to act in the same way as the General Engineer.

O Positioned on the Fortifications board and team. 4th.

Gd in Noord where the Department will be laid again, or during the war it should be and inspect everything for the establishment and give its information to the General Engineer and receive a resolution to determine that the Department is guilty of the Commander-in-Chief.

What will be the submissions from the command for affairs to the corps and the Fortification, and if it follows, submit it to the General Engineer, then not copying it, but present it in the original way and review it, if he agrees, then sign it, and when something is incomplete or the opposite, I will send it back with a written statement of my reasoning or allow the majority to submit it for consideration by the General Engineer, depending according to the circumstances of the case, he is guilty, and having received the resolution, the original officer should keep it with him, and for the Departments, he must appoint commanders on his own behalf with a warrant.

There should be a special review so that plans, profiles, and the most necessary places of cards are not numerous and where there is a need to be on commands, so many places of one card at a time should be allowed. And he can take it from the Archives kept at the office to look at it.

7th. About the work taking place at the capital every third of the year through

Department commanders must be aware and the General Engineer is responsible for reporting this.

The status of the team in his presence should be reported to him on a weekly basis, and those absent every month from the department commanders and the General Engineer should report about it.

So that the art of science brings its perfection to everyone and the desired success without burden has its strength, then it is most important to have the commander-in-chief of the Departments diligently observe the exams in everything as prescribed in the regulations, and consider the presented tasks and with my own knowledge of the skills of each represent the General Engineer on a daily basis in formal commands lists should.

To train as a practitioner, Minerov must

The report of the General Engineer is to act as announced in the regulation of the Mineral Arts.

O Engineer General Ma!orah.

Chapter U-ya. About their judgment and teams. 1st.

Each of them is equally obliged in the knowledge of sciences as an Engineer, a Lieutenant General, but so that the right of their Departments is diligent.

It was looked at and as soon as possible the presentations and resolutions to repair could be present at the office in St. Petersburg and all the offices in Moscow.

About the handed over Department as the Chief Overseer, diligent efforts should be made about all the excesses and shortcomings and, upon examination, be submitted to the Engineer General Lieutenant and a resolution and in general demand guilt from him.

After three years, they must be transferred from Department to Department according to the designation of the General Engineer and, in the absence of it, transferred from the Engineer General to the Lieutenant General, in order for everything that happens, written drawings according to the descriptions without taking them out with them should be left with those Departments so that the newly determined origin can be seen and corrected.

About all the work during construction, every month must be described through a description, and after a third, the Engineer General Porutchik must be informed about it.

When the fortification work is completed in the summer, then on what lines the buildings were carried out, then annually the fortresses must obtain neat plans and profiles, which, having examined and signed if they are similar to the reports of the work, the Engineer General will see to submit to the Porutchik, and when they are dissimilar, he will deal with the commands and will not be informed at his discretion Guilty of reporting.